Do and Do not in meeting for civil and structural engineer

It is common that having a meeting in any circumstances. The meeting is organised for solving some problem arise before,Guest Posting during and after project commence. Matters discussed vary and will not have any fix agenda for discussion. Therefore, as an engineer, he must with his own professionalism to attend and resolve matters arise for a project. Below are some recommendations that what should do during meeting.

1. Do prepare some home work before attending a meeting. It is good to has read through the minutes about coming meeting. Get prepare project information for answering during meeting. Never attend a meeting without knowing agenda of a meeting.

2. As an engineer, the answer of any matterĀ http://taifun.cloud/ is important. In order to make any discussion, he has to judge it properly before answering any queries arise. In proper answer any queries will affect engineer’s reputation.

3. If engineer know the answer, then answer it with his knowledge. As for example when if public want to know whether a cracked structure beam is safe to use. As an engineer, he must either answer Yes or No. Do not answer it in such a way that may be safe or not safe. If he is not sure, he should answer it by saying he needs to check it first and forward the result later.

4. Whenever an engineer is not clear about a matter, do not commit anything to that particular matter. He either says that he has to refer back to certain person in charge and convey message back later.

5. It is quite often that engineer has to commit date line of project such as when a design is ready, when can start work, when tender drawings ready and etc. Therefore, it is important that engineer has to prepare these answers before attend a meeting. The answers of date line must be based on his own work forces. He must know when a design of a project can be ready, when a project can start, when tender drawings can be prepared. Such answers are based on his own working experience. Do not commit any impossible or unclear date line. When engineer keeps on giving broken promises, his reputation will be affected. Later will affect company reputation.